We have completed many commercial projects including, water mains, sewer mains, storm water collection systems, land clearing, building excavation and backfill, duct bank, Parking lots, roads, sidewalks, curbing, paving, stream stabilization, demolition, too only name a few.

 
 Pictures #1,2 are of approximately 4000’ of water main installed for the Village of Hobart.

 

Pictures #3,4,5 are of a project for the Village of Stamford where we had to change or rehab 21 sewer manholes and line extension in the state highway.

 

Picture #6 is of a 5000’ underground electric duck bank for New York State Electric & Gas.

 

Picture #7,8,9,10 is taken at Tyco Healthcare in Hobart, N.Y. where we had to bring the grade up over 40’. They are checking the compaction with a nuclear density meter to insure the fill material is compacted to greater than 95% density.

 

Picture #11 is of the final grade and building being constructed.